SRBase: Difference between revisions
add information |
clarify |
||
| Line 19: | Line 19: | ||
* Work reservation and preparation - '''''http://www.mersenneforum.org/forumdisplay.php?f=81''''' The link is used for any base reservation. This avoids any duplicate work from other users | * Work reservation and preparation - '''''http://www.mersenneforum.org/forumdisplay.php?f=81''''' The link is used for any base reservation. This avoids any duplicate work from other users | ||
* Work creation - All bases over 1M tests (lower ranges) will be split into pieces. Normally there are 2-3 batches, 25-50k, 50-60k, 60-100k. Most of the work is done in Excel | * Work creation - All bases over 1M tests (lower ranges) will be split into pieces. Normally there are 2-3 batches, 25-50k, 50-60k, 60-100k. Most of the work is done in Excel | ||
* merge all results to lresults.txt | * Check results - merge all results to lresults.txt | ||
* Remove primes from a sievefile with the srfile app | * Remove primes from a sievefile with the srfile app | ||